Alert 04 – 14 Failure to Follow Lockout Procedure Results in Injury WHAT HAPPENED: Work requiring disconnection and removal commenced on a mud mixing pump assembly without
Alert 03 – 46 Proper Job Planning and Review WHAT HAPPENED: The company had several incidents recently where the root cause was determined to be a failure
Alert 03 – 38 Mud Pump Maintenance Operations Results in a Face Injury WHAT HAPPENED: While the night mechanic was assisting senior mechanic in removing chain driven
Alert 99 – 34 Gardner Denver Safety Notice WHAT HAPPENED: The purpose of this notice is to inform personnel who own or operate Gardner Denver mud pumps
Alert 99 – 06 Lockout/Tagout Procedures WHAT HAPPENED: After making a connection, the driller inadvertently kicked in the main pump from the driller’s console while the toolpusher and